At end of 2012 (during Obama two terms)
over two years -- Congress approved a
reconstruction project that
repaired stagnant water,
leaks to the pool, re-
engineering it with a
circulation and filtration
system using the nearby
Tidal Basin instead city
drinking water, making
the pools shallower to
save water and the bottom
was tinted gray to make
the water darker. . .
AP NEWS article by
Melissa Goldin (6/8/2026)
No comments:
Post a Comment